213052
| 3 | 213052 | Order | That the Commissioner of Public Works report on the possibility of including sidewalk curb cut snow clearance when in close proximity to stormwater drains scheduled for clearing following a snowstorm. | Work completed | |
Action details
|
Not available
|
213057
| 3 | 213057 | Order | That the Commissioner of Public Works update this Council on snow removal operations during and following the weather event of January 29, 2022. | Work completed | |
Action details
|
Not available
|
213100
| 3 | 213100 | Order | That the Commissioner of Public Works identify a permanent location for disposal of snow. | Work completed | |
Action details
|
Not available
|
213134
| 3 | 213134 | Order | That the Director of Engineering provide an update on Eversource’s re-sealing of the gas main between Acadia Park and Elm Street. | Work completed | |
Action details
|
Not available
|
213135
| 3 | 213135 | Order | That the Commissioner of Public Works contact the MA Department of Transportation to determine their plan for the recently condemned staircase connecting McGrath Highway to Ten Hills Road. | Work completed | |
Action details
|
Not available
|
213137
| 3 | 213137 | Order | That the Commissioner of Public Works replace all open garbage cans in city parks and on the Community Path with closed rat-proof garbage cans. | Work completed | |
Action details
|
Not available
|
213138
| 3 | 213138 | Order | That the Commissioner of Public Works update this Council with details on the sidewalk snow-shoveling pilot which was included in the FY2022 budget. | Work completed | |
Action details
|
Not available
|
213139
| 3 | 213139 | Order | That the Commissioner of Public Works establish a maximum time frame for a sidewalk panel to be dug up and replaced. | Work completed | |
Action details
|
Not available
|
213245
| 3 | 213245 | Order | That the Director of Engineering provide an update on Eversource's re-sealing of the gas main between Acadia Park and Elm Street. | Work completed | |
Action details
|
Not available
|
213246
| 3 | 213246 | Order | That the Commissioner of Public Works contact MA Department of Transportation to ascertain their plan for the recently condemned staircase connecting McGrath Highway to Ten Hills Road. | Work completed | |
Action details
|
Not available
|
213709
| 3 | 213709 | Order | That the Commissioner of Public Works resume the rain barrel program that was halted during the pandemic. | Work completed | |
Action details
|
Not available
|
213713
| 3 | 213713 | Order | That the Director of Infrastructure and Asset Management provide the Ward 4 Councilor with an estimated paving date for Douglas Street. | Work completed | |
Action details
|
Not available
|
212842
| 4 | 212842 | Order | That the Commissioner of Public Works address reports of trash barrels being picked up by recycling trucks. | Work completed | |
Action details
|
Not available
|
212963
| 4 | 212963 | Order | That the Director of Economic Development report on the maintenance plan for the Armory building, completion of outstanding repairs, and ongoing maintenance and operational oversight of the building. | Work completed | |
Action details
|
Not available
|
212964
| 4 | 212964 | Order | That the Director of Economic Development report on the status of existing leases for the Armory building. | Work completed | |
Action details
|
Not available
|