City of Somerville header
Meeting Name: Public Utilities and Public Works Committee Agenda status: Final
Meeting date/time: 12/7/2017 6:30 PM Minutes status: Final  
Meeting location: Committee Room – 2nd Floor – City Hall
City Hall
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments:
File #Ver.Agenda #TypeTitleActionResultAction DetailsVideo
202334 3202334OrderThat the Commissioner of Public Works address the ongoing graffiti on the Sacramento Street underpass and use a product to cover graffiti more permanently, and improve the lighting there as well.Work completed  Action details Not available
202724 3202724ResolutionThat the Superintendent of Schools look into how trash is kept at the Healy School, to prevent rodent activity.Work completed  Action details Not available
202727 3202727OrderThat the Commissioner of Public Works work with the Mayor, Representative Provost and Senator Jehlen to get the appropriate state agency to clean state-owned trash-filled land on the east and west sides of the Central Street Bridge.Work completed  Action details Not available
202731 3202731ResolutionThat the Administration consider providing a sprinkler and irrigation system for Prospect Hill Park.Work completed  Action details Not available
202765 3202765OrderThat the City Engineer and the Commissioner of Public Works implement an accessible pedestrian walkway on Poplar Street, surrounding ARTFARM, in anticipation of its future development.Work completed  Action details Not available
202773 3202773OrderThat the Director of SPCD update this Board on the Beacon Street reconstruction project with a timeline and significant design changes.Work completed  Action details Not available
202774 3202774OrderThat the Director of SPCD request information from MA DOT about the jersey barriers and asphalt triangle at McGrath Highway, approaching the overpass, and request that the space be converted to permeable green space if there are no further changes planned for the intersection.Work completed  Action details Not available
202784 3202784ResolutionThat the Administration develop a policy for temporary crosswalk painting or other measures to protect pedestrians when road work or other conditions prevent the immediate re-striping of road markings.Work completed  Action details Not available
202873 3202873OrderThat the Commissioner of Public Works replace the sidewalk panels on Highland Avenue, from the Veteran's Honor Roll to Putnam Avenue.Work completed  Action details Not available
202934 3202934OrderThat the Director of SPCD consider placing Pitman Street on the 2017 street resurfacing list.Work completed  Action details Not available
203270 3203270ResolutionThat the Administration inform this Board of an action plan for the parking lot at the Cummings School, as parked vehicles obstruct the basketball court.Work completed  Action details Not available
203282 3203282OrderThat the Commissioner of Public Works repair the Union Square businesses sign behind the SCAT building and install a "Welcome to Union Square" sign there as well.Work completed  Action details Not available
203361 3203361ResolutionThat the Administration, the City Solicitor and the Superintendent of Water and Sewer respond to a letter dated November 16, 2016 disputing St. James’s Episcopal Church's water and sewer bills.Work completed  Action details Not available
203370 3203370OrderThat the Commissioner of Public Works replace the burnt out light bulbs in the decorative street lights in Teele Square.Work completed  Action details Not available
203450 3203450OrderThat the City Engineer inspect the intersection of Ware Street and Russell Road, and Russell Road from #s 7 to 35, for the potential of more sink holes.Work completed  Action details Not available
203496 3203496OrderThat the Director of Engineering determine why the repaving job on Pitman Street between Belmont and Spring Streets is in its present condition, and why sink holes are now causing issues on the street.Work completed  Action details Not available
203507 3203507OrderThat the Commissioner of Public Works provide shaded areas for public pools including Foss Park and Dilboy.Kept in committee  Action details Not available
203491 3203491ResolutionThat the Administration facilitate the replacement of the wooden slats that provide the pedestrian foundation on the Webster Avenue Bridge.Work completed  Action details Not available
203510 3203510OrderThat the Director of Engineering install the four curb cuts near Maxwell’s Green that the city has committed to installing, and notify the Ward 5 Alderman of the timeline for their installation.Work completed  Action details Not available
203514 3203514OrderThat the Commissioner of Public Works remove the overgrowth from the rock outcrop behind the field house at Powderhouse Park, extending to the pedestrian walkway.Work completed  Action details Not available
203724 3203724OrderThat the Director of SPCD consider placing a bump-out at the corner of Lowell and Summer Streets.Work completed  Action details Not available
203803 3203803OrderThat the Director of SPCD coordinate with the Director of Traffic and Parking on all parking restrictions related to park and other construction projects, to ensure ample notice of parking restrictions to neighbors.Work completed  Action details Not available
203797 3203797OrderThat the Director of Water and Sewers repair the storm drain/catch basin that is sinking below the street surface on the south side of Kidder Avenue, by the Brown School near Willow Avenue.Work completed  Action details Not available
203794 3203794OrderThat the Director of Water and Sewers repair the depression around the sewer at the corner of Porter and Summer Streets.Work completed  Action details Not available
203862 3203862OrderThat the Commissioner of Public Works and Arborist implement an inspection and maintenance schedule to prevent the accumulation of trash, invasive plants, trees and weeds along the entire Community Path.Work completed  Action details Not available
203833 3203833OrderThat the Commissioner of Public Works direct the appropriate utility to remove the suspended double pole at 4 Howard Street.Work completed  Action details Not available
203835 3203835OrderThat the Director of SPCD prioritize Cameron Avenue for repaving.Work completed  Action details Not available
203867 3203867ResolutionThat the Mayor’s Office, working with the Director of Engineering, report to this Board on improving Eversource's communications with, and responsiveness to, this city's residents, concerning gas meter replacement, street construction and utility work.Kept in committee  Action details Not available
203872 3203872OrderThat the Building Department not issue any demolition permits until a rodent elimination program has been completed by the applicant, and provide an explanation to this Board whenever a permit is issued without a completed program.Work completed  Action details Not available
203873 3203873OrderThat the Director of SPCD repave Otis Street.Work completed  Action details Not available
203947 3203947OrderThat the Director of Engineering inspect the 41 Elmwood Street area for continual water and sewage flooding when severe rain storms occur.Work completed  Action details Not available
203964 3203964OrderThat all future Eversource requests be tabled by this Board until a signed commitment for better communication by Eversource is enacted.Work completed  Action details Not available
203970 3203970OrderThat the Commissioner of Public Works inform this Board of the city's new policies for utility companies to remove double poles and address low hanging wires.Work completed  Action details Not available
202254 3202254OrderThat the Commissioner of Public Works provide a disposition for the replacement of a tree that was removed at 27 Dane Avenue, and explain why repeated requests for tree replacements through 311 have not been answered.Work completed  Action details Not available
202266 3202266OrderThat the Commissioner of Public Works provide an explanation for recycled trash being collected by non-recycling trash companies.Work completed  Action details Not available
202305 3202305OrderThat the Commissioner of Public Works remove the tree at 151 Pearl Street.Work completed  Action details Not available
202307 3202307OrderThat the Commissioner of Public Works take the actions described within regarding the West Somerville Neighborhood School playground.Work completed  Action details Not available
202330 3202330OrderThat the City Engineer install the curb cut at the Warwick Street elbow, by the Community Path Extension ramp, that was promised many years ago as part of the Maxwell’s Green development.Kept in committee  Action details Not available
202331 3202331OrderThat the City Engineer install curb cuts and sidewalk ramps at the two curbs by Maxwell’s Green at the intersection of Clyde and Warwick Streets.Kept in committee  Action details Not available
202332 3202332OrderThat the City Engineer repair the curb cut and sidewalk ramp at the intersection of Murdock and Clyde Streets.Kept in committee  Action details Not available
204219 3204219ResolutionThat the Administration submit a funding proposal for a Priority Streets contract to address sidewalk panels that need replacement.Work completed  Action details Not available
204220 3204220OrderThat the Water Director clean all of the catch basins on Somerville Avenue.Work completed  Action details Not available
204240 3204240ResolutionThat the Administration update this Board on a process to notify utilities in advance when streets will be opened, so gas leaks can be addressed, including the date and location of notifications that have been provided in the past year.Work completed  Action details Not available
204354 3204354OrderThat the Commissioner of Public Works replace the removed tree stump at 6 Barton Street with a tree.Work completed  Action details Not available
204366 3204366OrderThat the Director of Parks and Recreation instruct the contractor for the Lincoln Park reconstruction to put up tarps or mesh shields to protect residents of Fremont and Parker Streets from dirt blowing into their houses during construction.Work completed  Action details Not available
204367 3204367OrderThat the Director of Parks and Recreation report back to this Board whether chain link fencing was represented in the original plans for Lincoln Park.Work completed  Action details Not available
204368 3204368OrderThat the Director of Parks and Recreation report back to this Board on whether the intensity of the excavation at Lincoln Park was factored into construction plans, and what steps will be taken to evaluate its impact on properties abutting the park.Work completed  Action details Not available
204370 3204370OrderThat the Director of Water and Sewer inform this Board whether it is protocol to notify residents of excessive water usage on their property, the means by which that is done, and the recourse residents have if they were not notified.Work completed  Action details Not available
204371 3204371OrderThat the Director of Water and Sewer explain to this Board any customer service offered to residents who question their water bills.Work completed  Action details Not available
204528 3204528ResolutionRequesting the Administration to compile contact information for all utilities, for reporting such issues as low hanging wires and gas leaks, and make it easily accessible on the city’s website.Work completed  Action details Not available
204546 3204546OrderThat the Commissioner of Public Works post “NO DUMPING” signs, with the amount of the fine, on the north edge of the Cambridge Health Alliance parking lot on Central Street. (2nd request)Work completed  Action details Not available
204549 3204549OrderThat the City Engineer, the Commissioner of Public Works, and the Water Director repair the pavement on Carver Street.Work completed  Action details Not available
204551 3204551OrderThat the Director of Capital Projects or the Director of Communications share with this Board the plan for keeping community members informed on a regular basis about the High School building project.Kept in committee  Action details Not available
204552 3204552OrderThat the Director of Capital Projects or the Director of SPCD update this Board about the transportation management and parking plans for both the construction and the post-construction phases of the new High School.Kept in committee  Action details Not available
204583 4204583Officer's CommunicationDirector of Water and Sewer responding to #204370 re: residential notifications for excessive water use.Work completed  Action details Not available
204584 4204584Officer's CommunicationDirector of Water and Sewer responding to #204371 re: customer service for questioned water bills.Work completed  Action details Not available
204665 4204665Officer's CommunicationDPW Commissioner responding to various Board Orders submitted 11/9/17.Work completed  Action details Not available
204506 4204506Officer's CommunicationDPW Commissioner responding to various Board Orders submitted 10/12/17.Work completed  Action details Not available
204361 4204361OrderThat MA DOT, Newport Construction and all other parties with knowledge of the cutting down of trees on Beacon Street on October 6, without any public notice, appear before this Board at its next regular meeting to respond to concerns about the surprise tree removal.Work completed  Action details Not available
204363 4204363ResolutionThe Administration assign or hire city staff to oversee the daily operations of contractor and utility company activity for the Beacon Street reconstruction project, and adopt a policy of such oversight for every state funded street reconstruction project going forward.Work completed  Action details Not available
204365 4204365OrderThat the Director of SPCD estimate for this Board the cost to move overhead wires underground on Beacon Street from Washington to Hampshire Streets, identify potential funding sources, and discuss the feasibility and impact of such an endeavor on the current Beacon Street project.Work completed  Action details Not available
204362 4204362OrderThat the Director of SPCD work with Mass DOT to cease all work on the Beacon Street reconstruction project until a full report on the removal of trees from the street is received and presented to this Board and until city staff is assigned day to day responsibility for oversight.Work completed  Action details Not available
204263 4204263OrderThat the Commissioner of Public Works request that the appropriate utility company address the low hanging wires on Mt. Vernon and Washington Streets.Kept in committee  Action details Not available
200223 4200223OrderThat the Commissioner of Public Works create clearly defined lines along Walnut Street, by Pearl Street and Broadway, to eliminate two lane traffic problems.Recommended to be sent for discussion  Action details Not available
200440 4200440OrderThat the Director of Constituent Services appear before this Board’s Committee on Public Utilities and Works with a written report on streetlamp repairs citywide.Work completed  Action details Not available
202333 4202333OrderThat the City Engineer repair the concrete on the pedestrian and bicycle ramp under the railroad bridge on Sacramento Street between Somerville Avenue and Miller Street. (3rd request)Work completed  Action details Not available
197756 4197756ResolutionThat the Administration report to this Board on its plan to implement the Tree Advisory Committee that is required by Ordinance 12-100, the Tree Preservation Ordinance.Work completed  Action details Not available
203983 4203983ResolutionThat the Mayor report to this Board by August 31, 2017 on ways to improve the poor communications from Eversource to residents around gas meter replacement, street construction, and other utility work. (2nd request)Work completed  Action details Not available
200645 4200645OrderThat the Commissioner of Public Works explain to this Board how to find out when a particular street is scheduled to be re-paved.Work completed  Action details Not available
200680 4200680OrderThat the Commissioner of Public Works appear before the Committee on Public Utilities and Works to address the assistance the City can provide for a city tree root that is growing into the basement of the home at 25 Meacham Street.Work completed  Action details Not available
200773 4200773OrderThat the Commissioner of Public Works describe to this Board, the rationale for treating multi-unit residences the same as single family residences for purposes of volume-based escalation of water rates.Kept in committee  Action details Not available
200874 4200874OrderThat the Director of Capital Projects advise the Ward 7 Alderman of the start date and schedule for sewer/relining on Powderhouse Blvd.Work completed  Action details Not available
200882 4200882OrderThat the Commissioner of Public Works and the Supervisor of Inspectional Services report to this Board on the repair of the sidewalk that is collapsing on Vernon Street, and what precautions are being taken for public safety.Work completed  Action details Not available
201007 4201007OrderThat the Commissioner of Public Works and the Director of SPCD consider replacing the unused concrete bus shelter at Broadway and Cedar Street with a garden, small park or sitting area, and report back by 5/12/16.Work completed  Action details Not available
201010 4201010OrderThat the Commissioner of Public Works replace the decorative lamppost that is missing from the stump at Old Magoun’s Saloon in Magoun Square. (2nd request)Work completed  Action details Not available
201012 4201012OrderThat the Director of SPCD install pigeon spikes underneath the Lowell Street bridge, above the Community Path Extension. (4th request)Work completed  Action details Not available
201144 4201144OrderThat the Commissioner of Public Works repair the disintegrating sidewalk at the entrance to the parking lot on Central Street used by the Cambridge Health Alliance, or require them to fix it if it is their responsibility.Work completed  Action details Not available
201270 4201270OrderThat the Commissioner of Public Works inform this Board of the options to adjust new LED street lighting, and the process to request such adjustments.Work completed  Action details Not available
201303 4201303OrderThat the Director of Engineering and/or the Supervisor of Inspectional Services provide address numbers to the properties on Chestnut Street and notify the property owners to display them on their buildings to facilitate identifying them.Work completed  Action details Not available
201319 4201319OrderThat the Commissioner of Public Works remove trash from the north side of the Cambridge Health Alliance parking lot off Central Street and behind Junction Park, and post NO DUMPING signs there.Work completed  Action details Not available
201423 4201423OrderThat the Commissioner of Public Works address the leaning utility pole at the East Somerville Community School on Glen Street.Work completed  Action details Not available
201473 4201473OrderThat the Commissioner of Public Works and/or the City Solicitor report to this Board on efforts to make the Albion Street sidewalk contractor repair the sidewalks or refund the City, and that the Commissioner of Public Works have the sidewalks repaired and report to this Board on when that will happen.Work completed  Action details Not available
201499 4201499OrderThat the Commissioner of Public Works clean the Community Path between Cedar and Lowell Streets, and consider erecting a barrier to prevent erosion from the hill alongside the path.Work completed  Action details Not available
201504 4201504OrderThat the Commissioner of Public Works consider installing an additional street lamp near 27, 31 and 33 Winslow Avenue.Work completed  Action details Not available
201586 4201586OrderThat the Director of SPCD and the Commissioner of Public Works consider creating shade at Grimmons Park and designing future parks with appropriate shade as well.Work completed  Action details Not available
201618 4201618OrderThat the Director of Engineering explain to this Board how to find out when a particular street is scheduled to be re-paved, or provide the city’s street paving list. (3rd request)Work completed  Action details Not available
201712 4201712OrderThat the Commissioner of Public Works repair the brick walkway between Holland Street and College Avenue in Davis Square Plaza.Work completed  Action details Not available
201713 4201713OrderThat the Commissioner of Public Works inspect the damaged wall at 93 Pearson Road and take action to remedy the situation.Work completed  Action details Not available
201701 4201701OrderThat the Commissioner of Public Works replace the 3 raised sidewalk panels at 61 Dartmouth Street. (2nd request)Work completed  Action details Not available
201767 4201767OrderThat the Superintendent of Inspectional Services direct Healey School staff to keep the grounds clean and properly dispose of trash, due to increased rodent activity around the school.Work completed  Action details Not available
201771 4201771OrderThat the Commissioner of Public Works remove all brush from the Mystic River along Shore Drive.Work completed  Action details Not available
201778 4201778OrderThat the Commissioner of Public Works direct Eversource to immediately remove the heavy plant overgrowth at the transfer station at Willow Avenue and Whipple Street.Work completed  Action details Not available
201795 4201795OrderThat the Commissioner of Public Works clean the Sacramento Street ramp that runs beneath the railroad tracks and confirm the regular maintenance schedule previously agreed to.Work completed  Action details Not available
201797 4201797OrderThat the Director of Engineering add Porter Street, between Summer and Elm Streets, to the 5-year paving plan, and include the streets off the west side of Porter Street, especially Carver Street.Work completed  Action details Not available
201826 4201826OrderThat the Commissioner of Public Works replace the black hot topped sidewalk at 985-987 Broadway with concrete and explain why Eversource claims they are not allowed to use concrete when replacing an opened sidewalk.Work completed  Action details Not available
201906 4201906OrderThat the Commissioner of Public Works direct the contractor who recently did work on Porter Street to repair and resurface the sink hole that is beginning to develop on Summer and Porter Streets.Work completed  Action details Not available
202029 4202029OrderThat the Director of SPCD, the Director of Capital Planning, and the City Engineer create a timeline from September 2016 to September 2019 for streetscape reconstruction projects in Ward 2 and post the timeline on the city’s website with continual updates as changes occur.Work completed  Action details Not available
202032 4202032OrderThat the City Engineer and the Director of SPCD report back to the Ward 2 Alderman on repairing the sidewalk on the Dane Street bridge and the wooden slats on the Webster Avenue/Newton Street Bridge, and on communications with the responsible State agencies.Work completed  Action details Not available
202034 4202034OrderThat the Director of SPCD add Avon Street to the paving list.Work completed  Action details Not available
202082 4202082OrderThat the Commissioner of Public Works, the Superintendent of Inspectional Services and the City Engineer report to this Board, the process for obtaining permission for a curb cut, including provisions made to ensure that the city’s ordinances are followed.Work completed  Action details Not available
196983 5196983ResolutionThat the Administration dedicate certain public buildings for community use.Work completed  Action details Not available
197238 5197238OrderThat the City Engineer review drainage on Shore Drive, especially with storm water runoff during heavy rains, particularly at the corner of Shore Drive and Putnam Street, as well as the impact of development at Assembly Square on the sewer outflow line.Work completed  Action details Not available
199295 5199295OrderThat the Director of SPCD discuss capitalizing on street repaving to bury utilities, beautify the city, and reduce the threat of power outages due to rain/snow/ice storms.Work completed  Action details Not available
199547 5199547OrderThat the Commissioner of Public Works and the Director of SPCD work with Eversource to remove the unsafe telephone poles secured to rotting trees on Woods Street at North Street, and on Barton Street at Broadway.Work completed  Action details Not available
199869 5199869ResolutionThat the Administration inform the Clark Street neighbors about the TV pipe testing which should have been performed in 2014.Work completed  Action details Not available
199955 5199955OrderThat the Director of SPCD (Transportation) consider installing a bollard at the top of the stairs at the Community Path Extension by Lowell Street, to prevent people from accidentally tumbling down the stairs.Work completed  Action details Not available
199956 5199956OrderThat the Commissioner of Public Works determine if the lighting at the Community Path Extension ramp and stairs by the Lowell Street bridge is sufficient, and if not, install more.Work completed  Action details Not available
197428 5197428OrderThat the Commissioner of Public Works repair the depression in the roadway in the east bound lane on Broadway just past its intersection with School Street.Work completed  Action details Not available
197489 5197489OrderThat the Commissioner of Public Works report to this Board about how utilities inform residents about work on their streets, utility poles or power lines.Work completed  Action details Not available
197625 5197625ResolutionThat NStar Electric report to this Board on its preparations to insure sufficient power for the redevelopment of Union Square.Work completed  Action details Not available
197724 5197724OrderThat the Director of SPCD and the Commissioner of Public Works report to this Board on the development, staffing and cost of a program to maintain street trees and keep tree wells clean and weed-free, and/or a program to assist and inspire residents to do so.Work completed  Action details Not available
200637 5200637OrderThat the Director of SPCD provide all Ward Aldermen with the 2016 street paving plan for all Wards.Work completed  Action details Not available
204446 5204446CommunicationCity Engineer responding to #203947 re: recurring flooding on Elmwood Street.Work completed  Action details Not available
198386 6198386OrderThat the Commissioner of Public Works update the Ward 5 Alderman on repairs to prevent pedestrians from tripping in the crosswalks at Linden Avenue on the south side of Summer Street, Aberdeen Road by Highland Avenue, and Hall Street by Cherry Street.Work completed  Action details Not available
198444 6198444OrderThat the Director of SPCD (ISD) report to this Board on the process for issuing citations during snowstorms to private plowing and shoveling contractors who are plowing snow into the street or onto neighbors' sidewalks.Work completed  Action details Not available
195528 6195528OrderThat this Board’s Committee on Public Utilities and Works explore Boston’s Code Ordinance CBC 9-1.3, which requires private rental units to be registered on an annual basis and inspections to be conducted for non-exempt units on a 5-year cycle.Work completed  Action details Not available
196186 7196186OrderThat the Commissioner of Public Works report to this Board whether it is possible to have the Public Schools open when there is a declared snow emergency, and, if it is possible, to also report the plan for teacher and staff parking, since school parking lots are used then for resident parking.Work completed  Action details Not available
196378 7196378OrderThat the Director of SPCD and/or the Commissioner of Public Works notify property owners along lower Broadway of the five year moratorium on renovations to private sewer systems and encourage them to make appropriate plans.Work completed  Action details Not available
197277 7197277OrderThat the Commissioner of Public Works notify the appropriate utility companies to remove the double pole on Cambria Street.Work completed  Action details Not available
198088 7198088OrderThat the Commissioner of Public Works investigate and report back on installing solar powered kiosks in our parks and playgrounds to communicate youth and family activities in our city.Work completed  Action details Not available
195521 9195521OrderThat the Commissioner of Public Works and the Director of SPCD (ISD) implement a plan to address trash and code violations each May and September, when student moves have the greatest impact on the City.Work completed  Action details Not available
196302 9196302OrderThat the Commissioner of Public Works report to this Board on the performance of the contractor who maintains the street lights, the terms of the contract and deliverables, and the process to ensure that street lights are maintained and operable.Work completed  Action details Not available