Title:
|
That the Director of SPCD (ISD) 1) ensure that the developer of 35R Lexington Avenue performs all required soil testing and provides the City Engineer with reports about drainage issues, 2) ensure that the developer completes the project in conformance with the relevant ZBA decision, and 3) permit any additional drainage mitigation needed.
|