Agenda Text
title
That the Director of Engineering consider repaving Carver Street and report to the Ward 5 Alderman on its condition and when it is scheduled to be repaved.
body
Official Text
That the Director of Engineering inspect Carver Street, consider repaving it before this winter, and report to the Ward 5 Alderman on its condition and when it is scheduled to be repaved.