Title:
|
Submitted by Comcast to install 268 feet of conduit in Somerville Ave from the intersection of Church Street, to a point of pickup at 379 Somerville Ave and 79 Bow St, and 126 feet of conduit to be installed from the proposed manhole for future use.
|