Skip to main content
City of Somerville header
File #: 209191    Version: 1
Type: Order Status: Approved
File created: 11/10/2019 In control: City Council
On agenda: 11/14/2019 Final action: 2/3/2020
Enactment date: 11/14/2019 Enactment #: 209191
Title: That the Director of Inspectional Services and/or the Director of Engineering report to this Council how the construction of driveways with pervious surfaces is inspected to ensure that the subsurface has been correctly installed so precipitation is absorbed.
Sponsors: Mark Niedergang, Stephanie Hirsch

  Agenda Text

title

That the Director of Inspectional Services and/or the Director of Engineering report to this Council how the construction of driveways with pervious surfaces is inspected to ensure that the subsurface has been correctly installed so precipitation is absorbed.

 

body

Official Text

That the Director of Inspectional Services and/or the Director of Engineering report to this Council on the process by which construction of driveways with pervious pavers, porous asphalt, or pervious concrete are inspected to ensure that the subsurface has been correctly installed and includes a “base course that doubles as a reservoir for the stormwater before it infiltrates into the subsoil” so that precipitation will be absorbed rather than run off.